Created 2026-11-12 · Updated 2026-11-16, promoted off the Moonshots #310 decomposition. Refreshed weekly (see How this page stays current at the bottom).
What it is (one line): Jeff Bezos's launch and lander company (New Glenn, Blue Moon), the second Artemis lander provider next to SpaceX, and as of 7 Nov 2026 a CLPS 2 awardee with the PROMISE south-pole rover mission.
What changed this week (10–16 Nov 2026, checked 16 Nov)
- ★ Out of NASA's commercial space station race. Blue Origin will not bid Orbital Reef in the Commercial LEO Destinations (CLD) Phase 2 competition. Company statement, emailed to Aviation Week on 12 Nov: "As our role supporting NASA's Artemis and Moon Base missions continues to grow, we're focusing resources on capabilities that directly advance our lunar projects." The statement does not name Orbital Reef and does not call the exit permanent (Aviation Week, Irene Klotz, 13 Nov, read at source). Blue Origin keeps an unfunded Space Act Agreement for crewed-vehicle work (same article). CEO Dave Limp told staff on 12 Nov (Eric Berger, Ars Technica, via TechTimes 13 Nov; ⚠️ the Ars post itself was not readable). Background: Blue Origin and Sierra Space won a CLD Phase 1 award in 2021. Whether Sierra Space bids on its own: not stated by either company.
- Proposal date conflict (CLD Phase 2): the press says proposals are due 8 Dec with awards around April 2027 (Aviation Week). A SAM.gov amendment posted 9 Nov lists a 14 Dec response date (SAM API, text not read). ⚠️ Not resolved.
- PROMISE power source settled. NASA's PROMISE page (read 16 Nov): "PROMISE will be powered by a multi-mission radioisotope thermoelectric generator (MMRTG)." The page also says "Blue Origin's Mark 1 lander will deliver PROMISE to the Moon's South Pole", for a late-2028 launch. The panel's "nuclear-powered" on Moonshots #310 is correct. The page's "last updated" date was not confirmed.
- No date moved. New Glenn return to flight is still reported as January 2027 (CNBC and Bloomberg, 5 Nov; from an internal memo, ⚠️ no Blue Origin public date). Blue Moon MK1 is still reported for Q1 2027 (secondary). blueorigin.com/news refused the fetch (HTTP 429), so no company post in the window was read.
- Missed last pass (5 Nov, before the window): Blue Origin announced a New Glenn third stage (GS3) and a new booster engine, Northstar (Spaceflight Now and Space.com, 5 Nov; company page not read ⚠️).
- Moonshots: EP311 (13 Nov) has no mention. EP310's two lines are already on this page.
- New and open: none new. CLD Phase 2 (CLDC) is already in the opportunities pipeline; an operator's way in stays the supplier route with the remaining station teams (Axiom, Vast, Voyager/Starlab).
Why it is in this archive
Gate: named in 22 episodes in the regex index (the research archive, rebuilt 2026-11-12) with no page. On Moonshots #310 it is a subject: Peter reads the CLPS 2 award and "Blue Origin received a contract to land uh a nuclearpowered rover called Promise on the on the lunar south pole in 2028" (1:57:07). It is also the procurement company Gonçalo's NASA lane already tracks on NASA.
The facts (from NASA, checked 10 Nov; re-read 2026-11-12)
- CLPS 2 (7 Nov 2026): one of eight awardees on "a 10-year, multiple-award, indefinite-delivery/indefinite-quantity master contract with a combined maximum value of $10 billion" (NASA RELEASE26-095).
- PROMISE: a south-pole rover on a Blue Origin Mark 1 lander, "a $94 million base contract, with an option period worth an additional $140 million", launch "late 2028", an 18-month mission (same release). Power: an MMRTG, per NASA's PROMISE page (read 2026-11-16), so "nuclear-powered" holds.
- VADR: one of three firms (with Arrow Science and Technology and Impulse Space) on six Moon Base cargo task orders worth "approximately $1.3 billion combined".
- Earlier CLPS: a $188M award (+$280.4M option).
- Blue Moon MK1 "Endurance": CLPS pathfinder to the south pole, slipped to 2027 (SpacePolicyOnline, 9 Nov).
- Artemis IV: NASA text (4 Nov): Blue Moon Mark 2 via Earth-orbit transfer stages, meeting Orion in a closer lunar orbit; both providers "targeting… a crewed lunar landing in 2028". Artemis III (2027) docks a Blue Moon MK2 test article first.
- Orbital Reef: CLD Phase 1 award with Sierra Space (2021); no bid in CLD Phase 2 (statement 12 Nov 2026, see What changed this week).
- New Glenn: exploded on the pad at LC-36 on 28 May 2026 (BE-4 main oxygen valve, per Blue Origin, 6 Aug). Return to flight reported for January 2027 (FT via TNW, 5 Nov; ⚠️ secondary); no Blue Origin date.
What the panel said
| episode | who | what | ts |
|---|---|---|---|
| Moonshots #310 | Peter Diamandis | the CLPS 2 list, Blue Origin among "SpaceX, Blue Origin, Loheed, and and Northrup"; PROMISE "nuclearpowered" in 2028 (✅ MMRTG per NASA's PROMISE page) | 1:56:44–1:57:20 |
| Moonshots #310 | Salim Ismail [attr?] |
"Why why nuclear as opposed to solar? You want to be on the dark side of the moon or something?"; Peter: the water ice is in the permanently shadowed craters | 1:57:20–1:57:41 |
What an operator can take from it
CLPS 2, VADR and PROMISE are task-order vehicles held by primes. Since 12 Nov, Blue Origin is putting its resources on the Moon, not low Earth orbit. A supplier pitch to them should be lunar (lander, surface, cargo), not station hardware. For a small company the door is a supplier or payload slot with one of the eight, not a direct NASA award. The award week is when that email lands. Track the awardees' supplier calls next to NASA's Open calls.
How this page stays current
- NASA: CLPS 2 procurement page, release list, PROMISE details. Diff: task orders, dates, power source.
- Blue Origin: blueorigin.com news; New Glenn return-to-flight date; Endurance launch. Diff: dates moved.
- Moonshots: grep new transcripts for
blue origin|new glenn|blue moon|bezos.
Related
NASA · SpaceX · Jared Isaacman · Lockheed Martin · Moonshots #310